Application Type | Application Fee |
Official Plan
Official Plan Amendment
Adjournment of Official Plan Amendment (at applicant's request)
|
$5,296
$842
|
Zoning By-law
Zoning By-law Amendment
Adjournment of Zoning By-law Amendment (at owner's request)
Removal of a Holding Symbol
Temporary Use By-law
Preparation of a Temporary Use Agreement
Extension of a Temporary Use
|
$4,694
$842
$1,203
$4,694
$2,165
$1,805
|
Plan of Subdivision
Draft Plan Approval of Subdivision (For greater certainty, the maximum fee shall be $7,822 plus $10,400 = $18,222)
Redline Revisions/Change of Conditions to Draft Plan
Extension to Draft Plan Approval
Final Plan Approval
Amendment to Subdivision Agreement
Part Lot Control
Deeming By-Law
Discharge of a Subdivision Agreement
|
$7,822 base fee plus $52 per lot/block to a maximum of $10,400
$3,447
$1,805
$2,845
$2,407
$1,203
$480
$1,203
|
Plan of Condominium
Draft Plan Approval of Condominium (For greater certainty, the maximum fee shall be $7,822 plus $10,400 = $18,222)
Redline Revisions/Change of Conditions to Draft Plan
Extension to Draft Plan Approval
Final Plan Approval
Condominium Conversion
Amendment to Condominium Agreement
Discharge of a Condominium Agreement
Condominium Exemption Request
|
$7,822 base fee plus $52 per lot/block to a maximum of $10,400
$3,447
$1,805
$2,845
$7,822
$2,407
$1,203
$1,736
|
Site Plan Control
Site Plan Control Approval (agreement)
Site Plan Control Approval (no agreement)
Amendment to Site Plan Agreement
Discharging of a Site Plan Agreement
|
$5,131
$2,080
$2,117
$1,203
|
Committee of Adjustment
Minor Variance/Expansion of Non-Conforming Use
Minor Variance (Building without a Permit)
Consent (New Lot)
Easement
Lot Addition/Boundary Adjustment
Adjournment of a Consent or Variance (at applicant's request)
Changes to Consent Conditions
Final Certification Fee
Validation of Title
|
$1,383
$1,805
$1,926
$1,323
$1,323
$601
$601
$240
$1,083
|
Combined Applications
Consent & Minor Variance
Consent & Development Agreement
Minor Variance & Development Agreement
|
$2,528
$4,211
$3,610
|
Miscellaneous
Quarry/Pit Establishment or Expansion
Telecommunication Facilities Consultation Process
Compliance Letter Express
Development Agreement
Discharging of a Development Agreement
Front Ending Agreement
OMB Subpoena - First Day
OMB Subpoena - Thereafter
|
$72,203
$1,805
$216
$2,888
$1,083
$1,805
$722
$480
|
Pre - Consultation
Pre-consultation Meetings (Major - Plans of Subdivision / Official Plan Amendment / Zoning By-law Amendment / Site Plan Control)*
Pre-consultation Meetings (Minor - Consent / Minor Variance)*
|
$520
$260
|
Engineering
Municipal Consent Permit Fee**
Lot Grading Plan Review
|
$364
$104
|
Site Alteration Permit Inspections**
Site Alteration Permit (1,000m³)
Permit application fee to be applied where the fill being removed or placed exceeds the following limits per lot size:
- 0.1 hectares or less/maximum of 10m3³
- >0.1 to 0.2 hectares/maximum of 50m³
- >0.2 to 0.5 hectares/maximum of 100m³
- >0.5 hectares or larger/maximum of 500m³
- >500m3 but less than 1,000m³
Site Alteration Permit (>1,000m³)
Permit application fee to be applied where the fill being removed or placed is greater than 1,000m³.
Site Alteration Permit Renewal/Extension (within limits)
Fee to be applied when a renewal/extension is granted two (2) months prior to the expiration of the Site Alteration Permit issued.
Note: A renewal/extension occurring after expiration of, or within two (2) months prior to the expiration of, the Site Alteration Permit is considered a new application and subject to new application fees.
Site Alteration Permit Renewal/Extension (exceeded limits)
Fee to be applied when a Site Alteration Permit (< 1,000m³) has been issued and subsequently, the amount of material has exceeded the allowable limits, and the renewal/extension is granted two (2) months prior to the expiration of the Site Alteration Permit issued.
Note: A renewal/extension occurring after expiration of, or within two (2) months prior to the expiration of, the Site Alteration Permit is considered a new application and subject to new application fees.
Post Site Alteration Permit Issuance Reviews
Engineering or zoning review or other changes after Site Alteration Permit has been issued.
Haul Route Inspections
Haul route inspections prior to, during and after issuance of a Site Alteration Permit.
Post-Commencement Permit Surcharge
Fees to be applied for any Site Alteration Permit application which has been made post-commencement of activities.
Site Alteration Violation Investigation
This fee shall be applied in any situation where work or activities have been undertaken for which a Site Alteration Permit is required but not obtained. This fee is in addition to all other fees, charges, and securities applicable under this By-law.
|
$520
$1,040
$520
$780
$1,040
$104/inspection
150% of applicable fees
100% of applicable application fee (each occurrence)
|
* The application fee is reduced by the amount paid for pre-consultation if the application is submitted within 18 months of the pre-consultation meeting date.
** A $1000.00 security deposit is required. The funds will be returned after final inspection if all works have been completed to the satisfaction of the City. The City has the right to use the funds if damage is not repaired or reinstated to the satisfaction of the City.
Refund of Fees
If an application is withdrawn before circulation to commenting agencies, ninety percent (90%) of the fee will be refunded . If withdrawn after circulation, but before notice of the public meeting is given, fifty percent (50%) of the fee will be refunded and if withdrawn after the notice of public meeting is given, but before the Planning and Development Services division Recommendation Report is prepared, twenty five percent (25%) of the fee will be refunded.
Reactivation
Any application which has been withdrawn and/or has been inactive for one year shall be considered abandoned and a full fee shall be required to activate a new application.
Note: Additional fees for most applications are required for Niagara Regional Development Services and the Niagara Peninsula Conservation Authority review. Applicants are recommended to contact each agency for their respective Fee Schedule. If fees are required, applicants must make out separate cheques payable to each agency at the time of application submission to the City.
PDF of Planning Fees
|