Water Safety Statement for Niagara

Posted by Niagara Peninsula Conservation Authority on Monday, February 4th, 2019

This notice is intended to update the public and local municipalities of the status of the watercourse conditions within the Niagara Peninsula and the eastern portions of the City of Hamilton and Haldimand County.

Over the last 48 hours, this region has experienced unusually warm temperatures which has melted the majority of the existing snowpack. Light rain in the amount of 5 to 10mm is forecast over the next few days, ending on Thursday. The combination of warm temperatures and rain will serve to increase water levels and destabilize the ice within our local watercourses.

Presently, the water levels in smaller water courses like 4 Mile Creek in Niagara-on-the-Lake and 12 Mile Creek in Pelham and Thorold have peaked and are beginning to recede. Larger watercourses like 20 Mile Creek and the Welland River are still on the rise but are not expected to reach critical levels. Due to the snow melt, some localized flooding of areas that are typically flood prone is expected or occurring at this time. The NPCA will continue to monitor stream and weather conditions closely and will issue further messages as required.

In addition, the increasing water levels will destabilize the existing ice and will raise the possibility of ice jam flooding. Residents are urged to keep themselves, children and pets well away from streams and creeks as these watercourses and their associated ice conditions will be hazardous. Drivers are reminded there is an increased risk of water over roads and should not drive through any flooded roadway, being particularly careful at night. Local municipalities are advised to check for debris and ice clogging culverts, catch basins, and other storm infrastructure.

Information on the Flood Status in the watershed and water levels within local watercourses can be found on the NPCA’s website at:

https://npca.ca/flood-status

https://npca.ca/stream-flow-monitoring

This notice is in effect until noon Friday, February 8th, 2019 and will be updated as required.

For further information contact:

Ryan Kitchen

Water Resource Technician

Niagara Peninsula Conservation Authority

250 Thorold Road West, 3rd Floor

Welland, Ontario L3C 3W2

tel. (905) 788-3135 ext. 269

rkitchen@npca.ca

www.npca.ca

 
 
 

News Archive

 
Water Quality Testing - Sugarloaf Harbour Mar…
With a geometric mean of 161 Sugarloaf Harbour is posted as safe for swimmi…
Michelle CuthbertThu Aug 1st, 2019
Water Quality Testing - Sugarloaf Harbour Mar…
The samples collected from the five sample points in Sugarloaf Harbour at S…
Michelle CuthbertWed Jul 31st, 2019
Statement from the City of Port Colborne Re: …
Statement from the City of Port Colborne Re: Reported E. coli levels in Sug…
Michelle CuthbertFri Jul 26th, 2019
Partial closure on Welland Canal Parkway Trai…
The Welland Canal Parkway Trail will be closed between the pedestrian bridg…
Michelle CuthbertMon Jul 22nd, 2019
Port Colborne's West Side Tennis Courts get a…
Outdoor tennis courts re-surfaced to accommodate pickleball
Michelle CuthbertTue Jul 16th, 2019
The travellers guide to Port Colborne for Can…
Everything you need to know about road closures, shuttle services and parki…
Michelle CuthbertTue Jul 16th, 2019
Rock of 80s band to kick off IceDogs exhibiti…
On Friday, August 30, 2019 the Rock of 80s band is set to host a free pre-g…
Michelle CuthbertMon Jul 15th, 2019
Canal Days Program is online!
Join us August 2-5 for the 41st Annual Canal Days Marine Heritage Festival.
Michelle CuthbertThu Jul 11th, 2019
« Prev 1 2 3 4 5 6 7 8 9 Next »