Wind Energy


Wind Energy

Site Profile

Wind Energy Manufacturing Cluster

Port Colborne, Ontario, Canada

General Site Description

This industrial wind energy manufacturing cluster includes two industrial sites comprising of 227 acres (92 ha) on the Welland Canal, which accommodates ships up to 225.6 metres in length. Ramey Road, at 119.5 acres (48.3 ha) is the proposed manufacturing facility location.

The City of Port Colborne's industrial land strategy identifies an additional 1200 acres (486 ha) of future industrial land adjacent the site, including 204 acres (82.5 ha) that are already zoned industrial and are available for consideration for future expansion.

The 107.9 acre (43.7 ha) Transport Canada Lands site is ideally situated for storage and marshalling and has direct access to full-draft seaway docking facilities. Both sites can be linked by a City-owned, locally operated rail line, and both offer connections to numerous provincial highways.

Construction of a custom manufacturing facility can begin as soon as possible. Several local construction contractors with extensive experience designing and building industrial facilities are available. Most supplies for construction can also be locally sourced.


Contact Information

For more information or further assistance, please contact:

Economic Development, Tourism & Marketing
City of Port Colborne
296 Fielden Avenue
Port Colborne, Ontario, L3K 4T6
Tel: 905-834-1668 ext. 500
Fax: 905-834-2072
Email the Economic Development Office